Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts

Wednesday, November 10, 2010

The Anyway Project for November

The categories for the Anyway Project are:

Domestic Infrastructure - these are the realities of home life, including making your home work better with less, getting organized, dealing with domestic life, etc...

  • getting the tin roof done on the back of the house
  • finishing the plastic on the crawl space insulation
  • sealing up the cellar foundation
  • build a cold closet in the heated basement

Household Economy: Financial goals, making ends meet, saving, barter etc...

  • selling off a Les Paul guitar that hubby doesn't use much
  • finding cheaper house insurance (done! and savings have gone to charity donations)

Resource Consumption : in which we use less of stuff, and strive to live in a way that has an actual future.

  • reduce daytime light use as much as practical
  • batch cooking

Cottage Industry and Subsistence:: The things we do that prevent us from needing to buy things, and the things we produce that go out into the world and provide for others. Not everyone will do both, but it is worth encouraging.

  • knitting socks for myself, mittens as a Christmas gift
  • putting together some baking mixes for Christmas gifts

Family and Community: Pretty much what it sounds like. How do we enable those to take the place of collapsing infrastructure?

  • teaching a celiac neighbor how to make no-knead gluten-free bread

Outside Work: Finding a balance, doing good work, serving the larger community as much as we can, within our need to make a living.

  • volunteer work with Peterborough Greenup's Urban Forest project (GIS mapping and data analysis)
  • volunteer work with the Festival of Trees' Green Team (we sort recyclables out of the festival's waste stream, saving upwards of $3000 in tipping fees so more money goes to Hospice, Hospital, and another health agency).

Time and Happiness: Those things without which there's really no point.

  • Nordic walking to enjoy the fall sunsets and warm afternoons
  • fiction reading (second-hand or borrowed books)
  • making digital photo collages of our year's travels for our scrapbook

Thursday, December 3, 2009

The Back Room Make-over

The "back room" is a poorly enclosed former sunporch built a number of years before we bought the house behind the kitchen. When we tore apart the entire upstairs, it was our bedroom. Once we had a proper master bedroom, it was set up as a reading/guest room with bookshelves. It was cozy with the gas fireplace. But running the fireplace was expensive and it didn't produce much heat when its fan broke. That's when we began closing off the room in the winter time and it became a storage area.

The worst thing you can do to a room is make it a storage area, especially when you're doing renovations elsewhere (my husband has torn apart and rebuilt his office/studio -- the house is subsequently warmer because the walls are now R-22, but he had to put stuff somewhere while doing it).

One good thing about my husband's renovation was that he used a lot of material that we had in storage in that room. Then we got rid of all the computer carcasses that had accumulated over the past seven years (some from us, others from friends). A former employer (who never paid) finally took away the electrical stuff my husband had been storing for him. Suddenly we could see expanses of floor.

With winter coming in, we had to seal one window whose storm plastic had gotten ripped. Earlier in the week I got rid of a lot of books, boxes, and an awkward display rack (now in pieces in wood storage for next spring's projects). While my husband cleared space in front of the window so I could work on it, I cleared out the cabinet and reordered things there.

The window has sliding glass panes with no weatherstripping (it will be replaced next year), so I sealed all the edges. When I was done I could no longer feel the wind through the window. Next I put on plastic and sealed that to the window frame. Afterwards my husband arranged stuff along that wall. All of our travel gear (other than luggage) is in one spot now. We discovered that the roof leaks in the corner opposite the window. That will probably be the last repair of the season.

I beefed up the doorway partition between the room and the kitchen. The doorway is four feet wide. We have a two-foot false wall in it that is now insulated. I'm going to add another layer of Reflectix to the door as well. We'll probably continue with a heavy blanket in the doorway for January and February.

We actually can see the floor now. The empty bookshelves may become this year's "cold storage".

Thursday, October 29, 2009

Adventures with Plumbing

Our house is over a hundred years old. As such it came with some knob-and-tube wiring, 100 amp service, two bathrooms with one sink between them, and a mix of galvanized and copper plumbing. The first few years were heavy reno years where we expanded the upper bathroom to have its own sink and a bigger tub with proper shower, put in a proper kitchen sink with a standard height counter, and put in a 200 amp service with circuit breakers rather than fuse.

My husband replaced the knob-and-tube wiring and put in proper GFI outlets in the bathrooms and kitchen. For the upstairs bath reno, we took showers the day after Christmas and then tore the room apart to studs and joists. While the guys reinforced the joists that had been improperly cut through when the upstairs plumbing was first run, I played with 3-D thinking, ABS pipe, and pipe solvent. We used CPVC for the water supply. That was easy to join to copper, but not to the galvanized. We always had a minor leak where the new supply lines joined the galvanizied cold water supply.

The supply lines in the basement were a maze. I dreamed some day of replaced the galvanized with copper. We got some replacement a few years back when we had to replace iron drains that were being clogged with tree roots. The plumber that did that job that entailed jack-hammering through the basement floor also replaced our main valve and a lot of the galvanized that was attached to it. That valve never really turned completely off. He had to have the water turned off at the curb. The valve he took out was a mass of corrosion that would have soon given way and flooded our basement.

Now that we could really turn the water off we were in the position to get the galvanized replaced. My husband was working with an unlicensed plumber named Mark and he agreed to do it. So a little over a year ago I bought a bunch of copper pipe on sale. It sat on a high shelf for a year.

Finally Mark was able to come over to do the piping change early this fall. We were in the process of getting a tankless water heater and knew where it was going to go. He routed new supply lines there. Over the course of the day he and my husband took out a lot of galvanized pipe. The short pieces went to metal recyling the next week; the long pieces I'm keeping for plant supports. Mark does not get along with plastic pipe, so I had to secure the one supply fitting that went from the new copper to my bathroom plastic system. We had one full length and two partial lenghs of copper left over. Some will go from the new supply ends to the new hot water heater; the rest will probably go into the garden.

A couple of years ago we had problems with the kitchen drain. We were able to take apart the drain system where it met the main iron outlet and clean it out. We started to use strainers in the kitchen sink drains (these trap coffee grounds and up) and had no more problems until this past month. First the sinks drained slowly. Then more slowly. But the dishwasher discharge drained fine. Then it didn't. That's when we called Mark the plumber again.

My husband picked him up the other night (he was currently without a driving license) and then an hour later he was off to a music jam down the street. I was to get him if there was a problem (something that involved more brute strength than I and Mark could muster). So I started to hang out with Mark as he dismantled the kitchen sink drains. The sink drains themselves needed replacing and we were missing a washer. So off to Home Depot we went. We talked a lot lot, trading reno war stories.

He got the new sink drains in and increased the drop from them to the P-trap. But the sinks still didn't drain. He ran his snake through but it didn't quite reach the main iron outlet. It came out of the cranking case he had for it, so I fetched a garbage bag he could put the withdrawn snake into. He ran more water and listened. There was still a blockage and the running of water through the system didn't sound right. We have a cheater valve on the sink drain system so he took that off and found it was no longer working. I happened to have a spare in my plumbing supplies so we didn't have to make a dash to Home Depot, hoping to get there before it closed.

The sinks still didn't drain. We went into the cellar and he found a maintenance outlet along the long horizontal length of drain. He took his snake outside and got it threaded back into its cranking case. I listened by the main iron outlet and let him know when the snake began clanging in it. There was nothing on the snake when he withdrew it, but the blockage would have just gone down that 4 inch pipe once the snake pushed it there.

I went up to run the water and he listened. The drain was flowing again. Upstairs he listened again. We both listened as we heard the chug-chugging of air coming into the cheater valve and helping the flow of water downward and out.

I drove with Mark to an ATM machine to get his $40 bucks. It was worth it.

We still have to get that tankless water heater in and the old one out... But Mark doesn't have a gas certificate and the utility company owns the old water heater. But we do have that high tub we want to replace with a shower that's easier to get in and out of as we get older!

Monday, July 20, 2009

The Great Cellar Refurb, Part 1

The cellar is small in width, depth, and height (even I at 5' 1" can bang my head on duct work). Strictly speaking it is a tall crawl space. But we have our laundry, freezer, water heater, furnace and storage down there.

In the spring we put in a hanging grow light over a fold-up camping table. Later I built a much shorter table so that we could use a gravity-fed waterer for the plants on it. I got longer chains for the grow light. When we're not growing things on it, it will be a platform for winter storage of vegetables that I built stackable bins for. Now we just needed a unit to put the water on.

Just a week or so ago, a neighbor put out a disassembled shelving unit on the boulevard. It was actually sawed off a hutch unit, but it was all wood. I reassembled it with an additional shelf, all spaced to hold canning jars. I painted the whole thing blue with acrylic enamel we had on hand. My husband found another shelf unit while sorting through our main floor storage room. I put two more shelves in it with everything spaced to hold canning jars. I painted that blue too.

Then we had to rearrange what storage we did have for home preserves to fit the units in. The metal shelf unit by the stairs came out. In its place went the unit from the neighbor. I commenced to moved all of the older preserves into it and put the two kettles I use for water bath processing on the top shelf; they're very handy to get at from the stairs. That freed up space on the bigger shelves along another wall for things that had been on the metal shelf unit, though an old enamel processor went to Freecyle.

We moved the top shelf of the metal unit down and put the unit between the stairs and the grow light table. The gravity fed waterer went on the moved top shelf. Other planting things will go on the other shelves.

The main unit I had built two years ago for home preserves had a decided lean to it. I took everything off, placing it either on top of the washer and dryer or in our wheeled laundry bin. I determined that the lean was due to the lay of the floor (it is rough cement). Rather than having it against the wall, I turned it 90 degrees and found a spot where it was horizontally level. If I put in a board brace to move its top away from the wall (which was not vertically level), then it would be vertically level as well as more stable. My husband found a piece of old paneling in our storage room that just fit the back of the unit. Jars won't fall out and that stabilizes the unit more too. The second new unit went across the end of the older unit to form a T. Everything is accessible.

I sorted the remaining preserves into older and this season's . The older preserves and empty jars went into the second new unit. This season's preserves went into the older unit. Now I don't have to search for the older stuff and I have plenty of empty space for new preserves.

Part 2 will be the wall shelves and the double bank of shelves on the other side of the stairs!

Saturday, June 27, 2009

Using the Forage

Yesterday I went out for my usual early morning Friday walk and saw nothing to come home with.

That was all right. I wasn't "shopping" for much anyway and I was in the process of de-cluttering anyway. This week I had a number of projects on the go that used the stuff I've foraged in the past few weeks.

Emergency watering: rain did not come as expected mid-week so the drip waters I made from kitty litter jugs and water jugs came into use. The grape vines, blueberry bush and pole beans were very happy.

I decided it was time I had a good salad garden outside my kitchen rather than have to go to the main garden to get salad fixings. I used eight of the concrete blocks I'd foraged to build one, using the lasagna method of a 6-sheet thick layer of wet newspaper over sod, then layering in compost and garden soil to a depth of 8". I also filled the cement block holes with the same compost and soil for salad complements such as radishes and peppercress. So the stack of bagged soil and compost is cleared from our side entry walk, as are the concrete blocks!

Once set up this is a prime spot for cat deposits unless the little beasts are kept out. I bought a T-bar post to support one end of a 6' by 4' fence panel built of reused lattice and new fence boards. The other end of the fence panel is secured to my shop shed corner. I had improvised a barrier with some green fence netting and a foraged small cement pillar to keep cats from my tomato and herb beds. That was easily transferred to serve as an interim gate from the T-bar to the kayak shed. The permanent gate will be of reused trellis and new fence boards as well.

More of the trellis will be a shade for the new greens. I already have shade supports built and painted from last season. The rest of the trellis will probably be made into portable cat barriers to protect the melon and bean areas.

When it rains here, it pours -- and the one rain barrel we have fills very quickly, then we see a lot of water going out the overflow. I picked up a plastic barrel that had a clamp lid. I reused the main hole in the lid for a hose from the first barrel's overflow. I filled around the hose with some leftover window screen. I drilled/cut another hole in the second barrel and installed more hose for that barrel's overflow. I had plenty of hose from a Friday forage to do this. Some of the pipe insulation that I took off the solar oven when it failed there as a gasket works fine as hose gasket (to keep out the mosquitoes). I may eventually put in a tap (I have a couple on hand from some other previous use) on the second barrel, but for now it is easy to lift the unclamped lid and get a pail or watering can of water. I've also got a remainder of old garden hose I can use to siphon water out of the second barrel. I used two thinner concrete blocks I had foraged to support the second barrel.

I also finally sealed (with a can of acrylic sealer I got in a remainder sale) the two framed pieces of fretwork hardboard from a yard sale, put the piano hinge on them that I got another yard sale and set up a new screen in the gazebo. That nicely cleared some clutter from the shop shed.

Thursday, June 4, 2009

Solar Oven Saga

I set up the solar oven at 10 am in the morning

It worked!

Maybe too well: the pipe insulation I used as a gasket material melted, the double pane window cracked when it hit the nail sticking out of the melted foam insulation, the meat thermometer blew its bottom off and I nearly burned my fingers lifting the pot cover to check how the orzo was doing. This was all by eleven-thirty in the morning. At least the candy thermometer was surviving; it read close to 250 degrees F.

I stripped off the gasket stuff, pulled out the nails and used a couple at the bottom of the window to keep it from sliding. At twelve-twenty I had overcooked orzo, but a good cold rinse made it edible for a pasta salad.

I decided to try cooking some rice, but a lot of intermittent cloud started to move in and I gave up on it at two-thirty.

I lost less than $2 in materials (the thermometer was a 25 cent yard sale purchase and I used two lengths of pipe insulation) and gained a powerful solar appliance. The double-paned window cost $3 at the local ReStore and everything else was reused material: 2" foam insulation scrap, 1 1/2" insulation scrap, the green plastic corrugated box my greenhouse came in last year, and tarp material used for lumber bundles. I bought the dark granite ware pot at the hardware store for $10.

I don't know how long the tarp material will last. I may have to upgrade to something more substantial -- such as aluminum flashing painted with high-temperature paint. It certainly works fine as a heat absorber in my solar dehydrator.

The foam insulation sure keeps the heat in and carries the cooker through an occasional cloud. I'd like to get a true oven thermometer for it, especially if I decide to set up a reflector for it to try baking. I'll keep an eye out for one at yard sales.

Saturday, May 23, 2009

To Screw or Not To Screw

They cost over $5 a pound and you need either a good arm and lots of patience or a strong powered screwdriver to put them in, but my hubby and I use wood screws in most of our wood construction, especially any framing.

When we close in pipes behind the shower, we make sure we can access them again. That means planning a structural piece that looks good in the finished room and securing it with screws. Because after you do the fix, you can screw it back in again, and don't have to worry about wrecking the look (or structural integrity) by yanking out nails to get in there again.

I've yanked out my share of nails when repurposing wood. It can be hard -- and dangerous -- work. That you can knock lots of nailed together things apart with a few strong whacks of a heavy hammer doesn't reassure you about the structural strength of things put together with nails.

Well, yesterday we decided to dismantle one of the two horsehoe pits we don't use. Out came the 18V cordless screwdriver and out came the screws. Only two were bent; the rest went into the screw box for that size. An hour later we had 4 6 foot 2x 6s, 4 corner posts, a 2 foot length of rebar, half a cubic yard of sand on and under the tarp cover by the garden fence and the area reseeded to clover.

Yeah, we'll just keep screwing around.